Werk #12134: Fix dynamic configuration executing only phase 1 in some cases
Komponente | Dynamic host configuration |
Titel | Fix dynamic configuration executing only phase 1 in some cases |
Datum | 17.02.2021 |
Checkmk Edition | Checkmk Enterprise (CEE) |
Checkmk-Version | 2.0.0b7 2.1.0b1 |
Level | Kleine Änderung |
Klasse | Bugfix |
Kompatibilität | Kompatibel - benötigt kein manuelles Eingreifen |
When a dcd connection was configured to operate in the central site of a distributed setup, the connection could fail with only executing the phase 1 of the synchronization. This was caused by a file etc/check_mk/dcd.d/wato/distributed.mk in the central site telling the DCD that it was a remote site.